febrero 01, 2016
Design and production in a very limited time, of a voting terminal for the development of an electoral process, giving the conceptual, design and volumetric solution to the implementation of the electronic components in the team, optimizing the manufacturing times.
Rush project phases:
• Conceptual design of product.
• Adequacy of components and assembling them in the terminal.
• Study and tests most suited to thermoplastic.
• Design tools and injection molds.
• Manufacture of injection molds.
• Preproduction validation.
• Making series.
This major project and complexity by the number of components to integrate and delivery was a success, fulfilling commitments of the customers.